IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Lift technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnosis, codes and the lift history.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Shaft, pit and the cabin rescue.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, tensioning and the industry report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Modernise, doors and the limit switch.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The residents, the porter and the night fault.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the person out, and sign the service.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin rescue
  • service lifts
  • tension cables
  • fault codes
  • shaft pit
  • cabin doors
  • industry report
  • modernise lifts

Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 231Civil engineer25%
  2. 232Petroleum engineer25%
  3. 233Production engineer25%
  4. 235Telecom engineer25%
  5. 236Electrical engineer25%
  6. 237Electronics engineer25%