Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Maintenance technician
22%
#389 / 633
View rankingMaintenance technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, history and spare orders.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Procedures, written LOTO and logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Diagnose, strip and repair.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Field preventative and measurements.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
On-call, shutdowns and production pressure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Safety, permits and not leaving the plant down.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS, history and spare orders
- Procedures, written LOTO and logs
- Diagnose, strip and repair
- Field preventative and measurements
- On-call, shutdowns and production pressure
- tecnico de mantenimiento
- maintenance technician
- mantenimiento industrial
Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115