IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Maxillofacial prosthetist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Mould, measures and the colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Design, the anchorage and the one that will not seal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fitting, the look and the one who does not recognise themselves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the silicone and the edge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The surgeon, the deadline and not rushing a bad colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it looks like them, and stays on.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • facial moulds
  • anchorage
  • silicone
  • skin colour
  • ocular prostheses
  • edges
  • prosthesis fittings
  • not rush the colour

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Analyse my job

Jobs with similar scores

  1. 239Civil engineer25%
  2. 240Petroleum engineer25%
  3. 241Production engineer25%
  4. 243Telecom engineer25%
  5. 244Electrical engineer25%
  6. 245Electronics engineer25%