Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Miner
16%
#606 / 633
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111