Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#261 / 713
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Non-commissioned officer
22%
#435 / 713
View rankingNon-commissioned officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drill, the trade and the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Barracks, the one who is late and the one who skives.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Guard, the weapon and not sleeping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, the mistake and not humiliating in public.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The officer, the order and not leaving the troops hanging.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they know the trade, and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill
- barracks
- guards
- weapons
- sheets
- the troops
- not humiliate
- the military trade
Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110