IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Research scientist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Literature review, figures and drafts.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Analysis, code and experiment boards.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the study and the controls.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Run the experiment or the fieldwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Lead a group, theses and authorship fights.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win funding and answer reviewers.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Literature review, figures and drafts
  • Analysis, code and experiment boards
  • Design the study and the controls
  • Run the experiment or the fieldwork
  • Lead a group, theses and authorship fights
  • Win funding and answer reviewers
  • cientifico
  • investigador
  • research scientist

Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 231Civil engineer25%
  2. 232Petroleum engineer25%
  3. 233Production engineer25%
  4. 235Telecom engineer25%
  5. 236Electrical engineer25%
  6. 237Electronics engineer25%