Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Risk manager
29%
#60 / 633
View rankingRisk manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, models and risk reporting.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Policies, limits and stress tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Escalate an incident and talk to desks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Committee, exceptions and negotiation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Data quality and model assumptions.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Stop the risk and sign the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, models and risk reporting
- Policies, limits and stress tests
- Escalate an incident and talk to desks
- Committee, exceptions and negotiation
- Data quality and model assumptions
- Stop the risk and sign the opinion
- risk manager
- gestor de riesgos
- riesgo operacional
Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413