IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

SCADA technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screen, tags and the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the PLC and the one that will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Historian, the gap and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Network, the port and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shift, the doubt and not hiding the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they see the alarm, and not dressing the historian.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SCADA screens
  • alarms
  • historian
  • tags
  • ports
  • field PLC
  • not leave ports open
  • shifts

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114

Analyse my job

Jobs with similar scores

  1. 267Civil engineer25%
  2. 268Petroleum engineer25%
  3. 269Production engineer25%
  4. 271Telecom engineer25%
  5. 272Electrical engineer25%
  6. 273Electronics engineer25%