IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Secondary teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Unit, criteria and the exam.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the group and the one who blows it up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cover, the corridor and the fight.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, the report and not giving a 5 for quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they work, and nobody left out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • unit plans
  • assessment criteria
  • secondary cover
  • corridors
  • the report
  • staff meeting
  • schools inspection
  • behaviour

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 241Civil engineer25%
  2. 242Petroleum engineer25%
  3. 243Production engineer25%
  4. 245Telecom engineer25%
  5. 246Electrical engineer25%
  6. 247Electronics engineer25%