IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Trader

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Book, liquidity and the ticket.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Execute, slippage and the one who panics.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Limits, risk and not blowing them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, P&L and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rumour, the news and not chasing.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Execute clean, and not blowing the price.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • order book
  • slippage
  • risk limits
  • P&L
  • liquidity
  • tickets
  • the close
  • news

Sources for this job· O*NET 41-3031.00· ESCO/ISCO 3311

Analyse my job

Jobs with similar scores

  1. 231Civil engineer25%
  2. 232Petroleum engineer25%
  3. 233Production engineer25%
  4. 235Telecom engineer25%
  5. 236Electrical engineer25%
  6. 237Electronics engineer25%