IS WORK OVER?

Automation index

How much of a Roofer’s job can AI already do?

A drawing and a tile order come earlier. Going up and not leaving a leak do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Roofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out slopes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tile, waterproof and finish ridges.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not cracking tiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a leak the first winter.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order material and set out slopes
  • Tile, waterproof and finish ridges
  • Heights, anchors and weather
  • Site, client and not cracking tiles
  • Logs, quantities and extras
  • Not leaving a leak the first winter
  • techador
  • cubiertas
  • roofer

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111

Biomedical equipment technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ticket, the inventory and the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICU, the ventilator and not switching off the one that is ventilating.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Theatre, the stack and the one that fails at induction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Part, the spare and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The clinician, the rush and not leaving the kit half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it works at three, and signing the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calibrate biomedical kit
  • ventilators
  • theatre stacks
  • clinical inventory
  • spares
  • ICU
  • not switch off the one ventilating
  • tickets

Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 650Drainlayer16%
  2. 651Lifeguard16%
  3. 652Tattoo artist16%
  4. 654Flight attendant16%
  5. 655Security guard16%
  6. 656Plasterer16%