IS WORK OVER?

Automation index

How much of a Roofer’s job can AI already do?

A drawing and a tile order come earlier. Going up and not leaving a leak do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Roofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out slopes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tile, waterproof and finish ridges.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not cracking tiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a leak the first winter.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order material and set out slopes
  • Tile, waterproof and finish ridges
  • Heights, anchors and weather
  • Site, client and not cracking tiles
  • Logs, quantities and extras
  • Not leaving a leak the first winter
  • techador
  • cubiertas
  • roofer

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 620Drainlayer16%
  2. 621Lifeguard16%
  3. 622Tattoo artist16%
  4. 624Flight attendant16%
  5. 625Security guard16%
  6. 626Plasterer16%