IS WORK OVER?

Automation index

How much of a Route planner’s job can AI already do?

An optimiser comes earlier. Fitting the windows without blowing the hours do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Route planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Optimise, windows and capacity.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Restrictions, tolls and the right vehicle.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The salesperson who promises and the plan that will not.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Recalc, incidents and the next day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The warehouse, the cut-off and not leaving the last one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it fits, and not blowing the hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • optimise routes
  • delivery windows
  • tolls
  • vehicle capacity
  • recalc
  • traffic restrictions
  • warehouse cut-off
  • driving hours

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 109BIM modeller28%
  2. 110Notary clerk28%
  3. 111Demand planner28%
  4. 113Psychologist28%
  5. 114Parts clerk28%
  6. 115Technical writer28%