IS WORK OVER?

Automation index

How much of a Safety engineer’s job can AI already do?

A HAZOP comes earlier. Stopping the plant without signing the risk that kills do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 385Mining engineer22%
  2. 386Bridge engineer22%
  3. 387Commissioning engineer22%
  4. 389Railway engineer22%
  5. 390Forestry engineer22%
  6. 391Geotechnical engineer22%