IS WORK OVER?

Automation index

How much of a Safety engineer’s job can AI already do?

A HAZOP comes earlier. Stopping the plant without signing the risk that kills do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Game developer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prototype, the loop and the input.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Physics, the bug and the one that teleports.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Build, the platform and the one that will not ship.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Frame, 30 and not leaving it at 8.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The designer, the fun and not cutting what it feels.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it plays, and not leaving the frame at 8.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • game prototypes
  • game loop
  • input
  • builds
  • frames
  • physics bugs
  • platforms
  • write game code

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 415Commissioning engineer22%
  2. 416Gas network engineer22%
  3. 417District heating engineer22%
  4. 419Welding engineer22%
  5. 420Tunnel engineer22%
  6. 421Power engineer22%