IS WORK OVER?

Automation index

How much of a Safety engineer’s job can AI already do?

A HAZOP comes earlier. Stopping the plant without signing the risk that kills do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 385Mining engineer22%
  2. 386Bridge engineer22%
  3. 387Commissioning engineer22%
  4. 389Railway engineer22%
  5. 390Forestry engineer22%
  6. 391Geotechnical engineer22%