How much of a Safety engineer’s job can AI already do?

A HAZOP comes earlier. Stopping the plant without signing the risk that kills do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 396Commissioning engineer22%
  2. 397Gas network engineer22%
  3. 398District heating engineer22%
  4. 400Welding engineer22%
  5. 401Power engineer22%
  6. 402Geomatics engineer22%