IS WORK OVER?

Automation index

How much of a Sales promoter’s job can AI already do?

A promo briefing comes earlier. Stopping the customer without lying about the product do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Sales promoter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, stand and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shelf, the one who walks by and the one who stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tasting, allergies and not pushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Data, contacts and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The supervisor, the space and not covering the shelf.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop the customer, and not lying.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stands
  • tasting
  • promo briefing
  • contacts
  • allergies
  • the shelf
  • promo kit
  • store supervisor

Sources for this job· O*NET 41-9011.00· ESCO/ISCO 5242

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 368Vocational teacher22%
  2. 369Golf professional22%
  3. 370Music teacher22%
  4. 372Dental technician22%
  5. 373Cheesemaker22%
  6. 374Office receptionist22%