Automation index
How much of a SAP specialist’s job can AI already do?
A customising and a report come earlier. Payroll coming out on the 30th does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
SAP specialist
25%
AI can already do 25% of this job.
#258 / 733
View rankingSAP specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Customising, specs and module tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Integrations, IDocs and interface faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Key user, training and resistance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Go-lives and windows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, authorisations and audit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a company unable to invoice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Customising, specs and module tests
- Integrations, IDocs and interface faults
- Key user, training and resistance
- Go-lives and windows
- Documentation, authorisations and audit
- Not leaving a company unable to invoice
- especialista sap
- consultor sap
- erp specialist
Sources for this job· O*NET 15-1211.00· ESCO/ISCO 2511
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142