IS WORK OVER?

Automation index

How much of a Scaffolder’s job can AI already do?

A drawing and a delivery note come earlier. A scaffold that does not fall does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Adult-education teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pathway, level and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Class, the one from work and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Literacy, the form and the one who cannot sign.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assess without humiliating, and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Life, the children and not losing them in October.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they come back, and not being ashamed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • adult pathways
  • literacy
  • forms
  • evening classes
  • certificates
  • October
  • levels
  • not humiliate

Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 604Stevedore16%
  2. 605Crane operator16%
  3. 606Miner16%
  4. 608Baker16%
  5. 609Cleaner16%
  6. 610Drainlayer16%