IS WORK OVER?

Automation index

How much of a Scaffolder’s job can AI already do?

A drawing and a delivery note come earlier. A scaffold that does not fall does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 624Stevedore16%
  2. 625Crane operator16%
  3. 626Miner16%
  4. 628Baker16%
  5. 629Cleaner16%
  6. 630Drainlayer16%