IS WORK OVER?

Automation index

How much of a Scaffolder’s job can AI already do?

A drawing and a delivery note come earlier. A scaffold that does not fall does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 604Stevedore16%
  2. 605Crane operator16%
  3. 606Miner16%
  4. 608Baker16%
  5. 609Cleaner16%
  6. 610Drainlayer16%