IS WORK OVER?

Automation index

How much of a Scaffolder’s job can AI already do?

A drawing and a delivery note come earlier. A scaffold that does not fall does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 724Stevedore16%
  2. 725Crane operator16%
  3. 726Miner16%
  4. 728Baker16%
  5. 729Cleaner16%
  6. 730Drainlayer16%