IS WORK OVER?

Automation index

How much of a Scaffolder’s job can AI already do?

A drawing and a delivery note come earlier. A scaffold that does not fall does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Ticket inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Validate, fares and the intervention note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Aisle, the group and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fines, data and what you can ask.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the full train and calling the conductor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The insult, keeping calm and not making a scene.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Charge fairly, and not skipping a coach.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • validate tickets
  • rail fares
  • interventions
  • on-train fines
  • walk coaches
  • call the conductor
  • passenger data
  • full trains

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 5112

Analyse my job

Jobs with similar scores

  1. 614Stevedore16%
  2. 615Crane operator16%
  3. 616Miner16%
  4. 618Baker16%
  5. 619Cleaner16%
  6. 620Drainlayer16%