Automation index
How much of a School sports coach’s job can AI already do?
A stock session comes earlier. All of them playing, not just the chair's child, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
School sports coach
22%
AI can already do 22% of this job.
#372 / 733
View rankingSchool sports coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Session, the kit and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Pitch, the one who never gets the ball and the one who humiliates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Injury, the protocol and calling home.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Match, the score and not shouting at a child.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The parent, the bench and not yielding.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they all play, and not just the chair's child.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- school sessions
- minute rotation
- injury protocol
- parents on the bench
- not shout at children
- kit
- matches
- inclusion
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142