Automation index
How much of a Schools inspector’s job can AI already do?
A visit rubric comes earlier. Walking into the classroom and saying what is there, not what they want to hear, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Schools inspector
27%
AI can already do 27% of this job.
#186 / 753
View rankingSchools inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Visit, the rubric and the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Classroom, what happens and not the slide deck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Report, the school and not softening it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appeal, the union and not yielding the figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The minister, the pressure and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Say what is there, and not what they want to hear.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspection visits
- rubrics
- school reports
- real classrooms
- appeals
- not soften
- the department
- school evaluation
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422
IS WORK OVER?
HVAC engineer
27%
#173 / 753
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149