IS WORK OVER?

Automation index

How much of a Screenwriter’s job can AI already do?

A bible and a treatment come earlier. Knowing which scene cuts, which joke lives, and what the showrunner wants do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Screenwriter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bibles, treatments and sequence breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Dialogue, variants and fast rewrites.
Estimate

No public source provides a precise figure. This is our estimate.

20%40%+8
Writers’ room and showrunner notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Fit to budget, locations and cast.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pitch, sale and studio relationship.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide tone, cut and what is not written.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bibles, treatments and sequence breakdowns
  • Dialogue, variants and fast rewrites
  • Writers’ room and showrunner notes
  • Fit to budget, locations and cast
  • Pitch, sale and studio relationship
  • Decide tone, cut and what is not written
  • guionista
  • screenwriter
  • script

Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Analyse my job

Jobs with similar scores

  1. 200Set designer26%
  2. 201Statistician26%
  3. 202Cultural manager26%
  4. 204Structural engineer26%
  5. 205Process engineer26%
  6. 206Midwife26%