Automation index
How much of a Screenwriter’s job can AI already do?
A bible and a treatment come earlier. Knowing which scene cuts, which joke lives, and what the showrunner wants do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Screenwriter
26%
AI can already do 26% of this job.
#203 / 623
View rankingScreenwriter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bibles, treatments and sequence breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Dialogue, variants and fast rewrites.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 40% | +8 |
Writers’ room and showrunner notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Fit to budget, locations and cast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pitch, sale and studio relationship.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide tone, cut and what is not written.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bibles, treatments and sequence breakdowns
- Dialogue, variants and fast rewrites
- Writers’ room and showrunner notes
- Fit to budget, locations and cast
- Pitch, sale and studio relationship
- Decide tone, cut and what is not written
- guionista
- screenwriter
- script
Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142