IS WORK OVER?

Automation index

How much of a Screenwriter’s job can AI already do?

A bible and a treatment come earlier. Knowing which scene cuts, which joke lives, and what the showrunner wants do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Screenwriter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bibles, treatments and sequence breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Dialogue, variants and fast rewrites.
Estimate

No public source provides a precise figure. This is our estimate.

20%40%+8
Writers’ room and showrunner notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Fit to budget, locations and cast.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pitch, sale and studio relationship.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide tone, cut and what is not written.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bibles, treatments and sequence breakdowns
  • Dialogue, variants and fast rewrites
  • Writers’ room and showrunner notes
  • Fit to budget, locations and cast
  • Pitch, sale and studio relationship
  • Decide tone, cut and what is not written
  • guionista
  • screenwriter
  • script

Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 200Set designer26%
  2. 201Statistician26%
  3. 202Cultural manager26%
  4. 204Structural engineer26%
  5. 205Process engineer26%
  6. 206Midwife26%