Automation index
How much of a Screenwriter’s job can AI already do?
A bible and a treatment come earlier. Knowing which scene cuts, which joke lives, and what the showrunner wants do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Screenwriter
26%
AI can already do 26% of this job.
#203 / 623
View rankingScreenwriter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bibles, treatments and sequence breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Dialogue, variants and fast rewrites.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 40% | +8 |
Writers’ room and showrunner notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Fit to budget, locations and cast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pitch, sale and studio relationship.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide tone, cut and what is not written.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bibles, treatments and sequence breakdowns
- Dialogue, variants and fast rewrites
- Writers’ room and showrunner notes
- Fit to budget, locations and cast
- Pitch, sale and studio relationship
- Decide tone, cut and what is not written
- guionista
- screenwriter
- script
Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641
IS WORK OVER?
Electrical engineer
25%
#236 / 623
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151