Automation index
How much of a Screenwriter’s job can AI already do?
A bible and a treatment come earlier. Knowing which scene cuts, which joke lives, and what the showrunner wants do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Screenwriter
26%
AI can already do 26% of this job.
#203 / 623
View rankingScreenwriter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bibles, treatments and sequence breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Dialogue, variants and fast rewrites.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 40% | +8 |
Writers’ room and showrunner notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Fit to budget, locations and cast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pitch, sale and studio relationship.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide tone, cut and what is not written.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bibles, treatments and sequence breakdowns
- Dialogue, variants and fast rewrites
- Writers’ room and showrunner notes
- Fit to budget, locations and cast
- Pitch, sale and studio relationship
- Decide tone, cut and what is not written
- guionista
- screenwriter
- script
Sources for this job· O*NET 27-3043.00· ESCO/ISCO 2641
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146