Automation index
How much of a Semiconductor technician’s job can AI already do?
A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Semiconductor technician
22%
AI can already do 22% of this job.
#394 / 633
View rankingSemiconductor technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, tool and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the suit and the one that contaminates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Metrology, the defect and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, the yield and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The engineer, the change and not touching blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The batch comes out, and the room intact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wafers
- cleanroom
- yield
- metrology
- process recipes
- contamination
- chip batches
- suits
Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114
IS WORK OVER?
Architect
28%
#81 / 633
View rankingArchitect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Draft plans, sections and a first BIM model from the brief.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Produce renders, views and façade options.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Write quantities, specs and the project report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Meetings with client, developer and planning office.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Site direction and inspection visits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Stamp, register and own legal responsibility.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 8% | +1 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Produce renders, views and façade options
- Site direction and inspection visits
- arquitect
- architect
- proyecto de edificio
Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161