Automation index
How much of a Semiconductor technician’s job can AI already do?
A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Semiconductor technician
22%
AI can already do 22% of this job.
#403 / 643
View rankingSemiconductor technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, tool and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the suit and the one that contaminates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Metrology, the defect and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, the yield and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The engineer, the change and not touching blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The batch comes out, and the room intact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wafers
- cleanroom
- yield
- metrology
- process recipes
- contamination
- chip batches
- suits
Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114
IS WORK OVER?
Landscape architect
24%
#282 / 643
View rankingLandscape architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, species and the irrigation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Works, levels and the tree that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Soil, climate and not planting what will not last.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Client, maintenance and what they will not water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
August, the drought and the yes to xeriscape.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is lived in, and not dying in August.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- planting plans
- species
- garden irrigation
- xeriscape
- works levels
- soil
- garden maintenance
- trees
Sources for this job· O*NET 17-1012.00· ESCO/ISCO 2162