Automation index
How much of a Semiconductor technician’s job can AI already do?
A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Semiconductor technician
22%
AI can already do 22% of this job.
#394 / 633
View rankingSemiconductor technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, tool and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the suit and the one that contaminates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Metrology, the defect and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, the yield and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The engineer, the change and not touching blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The batch comes out, and the room intact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wafers
- cleanroom
- yield
- metrology
- process recipes
- contamination
- chip batches
- suits
Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114
IS WORK OVER?
Nature guide
22%
#337 / 633
View rankingNature guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, species and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the one who will not quiet and the one who lags.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Weather, the path and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Interpret, not reciting and the one who asks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, the nest and not getting too close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they look, and not leaving litter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- nature routes
- species
- interpret
- nests
- capacity
- paths
- field groups
- litter
Sources for this job· O*NET 39-7012.00· ESCO/ISCO 5113