Automation index
How much of a Semiconductor technician’s job can AI already do?
A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Semiconductor technician
22%
AI can already do 22% of this job.
#394 / 633
View rankingSemiconductor technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, tool and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the suit and the one that contaminates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Metrology, the defect and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, the yield and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The engineer, the change and not touching blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The batch comes out, and the room intact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wafers
- cleanroom
- yield
- metrology
- process recipes
- contamination
- chip batches
- suits
Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114
IS WORK OVER?
Robotics engineer
25%
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149