IS WORK OVER?

Automation index

How much of a Semiconductor technician’s job can AI already do?

A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Semiconductor technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipe, tool and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Room, the suit and the one that contaminates.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Metrology, the defect and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shift, the yield and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The engineer, the change and not touching blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The batch comes out, and the room intact.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • wafers
  • cleanroom
  • yield
  • metrology
  • process recipes
  • contamination
  • chip batches
  • suits

Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 391Metrology technician22%
  2. 392Waste technician22%
  3. 393Irrigation technician22%
  4. 395Telephony technician22%
  5. 396Orthotic and prosthetic technician22%
  6. 397Food technologist22%