Automation index
How much of a Semiconductor technician’s job can AI already do?
A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Semiconductor technician
22%
AI can already do 22% of this job.
#394 / 633
View rankingSemiconductor technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, tool and the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the suit and the one that contaminates.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Metrology, the defect and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, the yield and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The engineer, the change and not touching blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The batch comes out, and the room intact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wafers
- cleanroom
- yield
- metrology
- process recipes
- contamination
- chip batches
- suits
Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114
IS WORK OVER?
Wall tiler
19%
#476 / 633
View rankingWall tiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and the tile format.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adhesive, set and the tray fall.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, drill and the tile that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grout, seal and the bath junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the model change and the stock that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ugly cut, and no leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tile walls
- set out joints
- bed tiles
- tray fall
- seal junctions
- cut tiles
- drill tile
- grout
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122