IS WORK OVER?

Automation index

How much of a Semiconductor technician’s job can AI already do?

A wafer recipe comes earlier. The batch coming out without eating the cleanroom do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Semiconductor technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipe, tool and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Room, the suit and the one that contaminates.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Metrology, the defect and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shift, the yield and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The engineer, the change and not touching blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The batch comes out, and the room intact.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • wafers
  • cleanroom
  • yield
  • metrology
  • process recipes
  • contamination
  • chip batches
  • suits

Sources for this job· O*NET 51-9141.00· ESCO/ISCO 3114

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 400Metrology technician22%
  2. 401Waste technician22%
  3. 402Irrigation technician22%
  4. 404Telephony technician22%
  5. 405Orthotic and prosthetic technician22%
  6. 406Food technologist22%