Automation index
Can AI do the work of a Senior developer?
Today an AI can already do 37% of this job. Architecture, the hard calls, and review still need someone who has broken production.
It does not try to predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Senior developer
37%
AI or a robot can already do 37% of this job.
#13 / 103
View rankingSenior developer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Modify existing software to correct errors, adapt it to new hardware, or upgrade interfaces and improve performance.EstimateNo public source pins this saving. It is an estimate of the method. | 11% | 28% | +3.1 |
Design, develop and modify software systems, using scientific analysis and mathematical models to predict and measure outcomes and consequences of design.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 48% | +4.8 |
Store, retrieve, and manipulate data for analysis of system capabilities and requirements.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 48% | +4.8 |
Confer with systems analysts, engineers, programmers and others to design systems and to obtain information on project limitations and capabilities, performance requirements and interfaces.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 48% | +4.3 |
Supervise the work of programmers, technologists and technicians and other engineering and scientific personnel.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 22% | +1.8 |
Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 48% | +3.4 |
Develop or direct software system testing or validation procedures, programming, or documentation.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 55% | +3.9 |
Consult with customers or other departments on project status, proposals, or technical issues, such as software system design or maintenance.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 33% | 28% | +9.2 |
| Total | 100% | 37% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- write code
- programming
- software development
- coding
- debug code
- computer programming
- decentralized application frameworks
- blockchain openness
- software components libraries
- ICT debugging tools
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512
IS WORK OVER?
Accountant
35%
#17 / 103
View rankingAccountant
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Supervise auditing of establishments, and determine scope of investigation required.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 22% | +2.6 |
Analyze business operations, trends, costs, revenues, financial commitments, and obligations to project future revenues and expenses or to provide advice.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 48% | +4.3 |
Develop, implement, modify, and document recordkeeping and accounting systems, making use of current computer technology.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 55% | +4.4 |
Report to management regarding the finances of establishment.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 55% | +3.9 |
Inspect account books and accounting systems for efficiency, effectiveness, and use of accepted accounting procedures to record transactions.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 55% | +3.9 |
Prepare adjusting journal entries.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Review accounts for discrepancies and reconcile differences.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Establish tables of accounts and assign entries to proper accounts.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 38% | 28% | +10.6 |
| Total | 100% | 35% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- ledger entries
- close accounts
- reconcile banks
- accounting department processes
- financial department processes
- economics
- corporate law
- accounting
- inspect tax returns
- control financial resources
Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411