Automation index
How much of a Senior developer’s job can AI already do?
Today an AI can already do 37% of this job. Architecture, the hard calls, and review still need someone who has broken production.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Senior developer
37%
AI can already do 37% of this job.
#13 / 623
View rankingSenior developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Modify existing software to correct errors, adapt it to new hardware, or upgrade interfaces and improve performance.EstimateNo public source provides a precise figure. This is our estimate. | 11% | 28% | +3.1 |
Design, develop and modify software systems, using scientific analysis and mathematical models to predict and measure outcomes and consequences of design.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 48% | +4.8 |
Store, retrieve, and manipulate data for analysis of system capabilities and requirements.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 48% | +4.8 |
Confer with systems analysts, engineers, programmers and others to design systems and to obtain information on project limitations and capabilities, performance requirements and interfaces.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 48% | +4.3 |
Supervise the work of programmers, technologists and technicians and other engineering and scientific personnel.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 22% | +1.8 |
Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 48% | +3.4 |
Develop or direct software system testing or validation procedures, programming, or documentation.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 55% | +3.9 |
Consult with customers or other departments on project status, proposals, or technical issues, such as software system design or maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 33% | 28% | +9.2 |
| Total | 100% | 37% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- write code
- programming
- software development
- coding
- debug code
- computer programming
- decentralized application frameworks
- blockchain openness
- software components libraries
- ICT debugging tools
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512
IS WORK OVER?
Valet
19%
#536 / 623
View rankingValet
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tag, keys and the bay map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive someone else’s, the tight car park and not marking it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
The client already out and the car still downstairs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Insurance, the knock and who pays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The event, the rain and not losing a key.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No mark, and the car on time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- keep keys
- park others’ cars
- bay map
- not mark
- valet events
- knock insurance
- tight car park
- return on time
Sources for this job· O*NET 53-6021.00· ESCO/ISCO 8322