IS WORK OVER?

Automation index

How much of a Set designer’s job can AI already do?

A sketch and a 3D come earlier. A set that stands and can be shot do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Set designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
The reading, references and the space concept.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, model, 3D and the element list.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Build, workshop and fit-up in the room or on set.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rehearsals, changes and what direction asks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, props and the trades.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
That it stands, reads, and comes down.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design sets
  • make models
  • set drawings
  • fit up
  • props
  • space concept
  • set 3D
  • stage fit-up

Sources for this job· O*NET 27-1027.00· ESCO/ISCO 3432

Irrigation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, controller and the sector.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dripper, valve and the leak you cannot see.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Filters, fertigation and the blockage.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, pressure and the one that does not reach the end.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The drought, the water turn and not fighting the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The block watered, and not drowning it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • irrigation controllers
  • drippers
  • sectors
  • fertigation
  • valves
  • filters
  • field pressure
  • water turns

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114

Analyse my job

Jobs with similar scores

  1. 197Drafter26%
  2. 198Web developer26%
  3. 199Game designer26%
  4. 201Statistician26%
  5. 202Cultural manager26%
  6. 203Screenwriter26%