IS WORK OVER?

Automation index

How much of a Set designer’s job can AI already do?

A sketch and a 3D come earlier. A set that stands and can be shot do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Set designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
The reading, references and the space concept.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, model, 3D and the element list.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Build, workshop and fit-up in the room or on set.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rehearsals, changes and what direction asks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, props and the trades.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
That it stands, reads, and comes down.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design sets
  • make models
  • set drawings
  • fit up
  • props
  • space concept
  • set 3D
  • stage fit-up

Sources for this job· O*NET 27-1027.00· ESCO/ISCO 3432

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 233Drafter26%
  2. 234Web developer26%
  3. 235Game designer26%
  4. 237Statistician26%
  5. 238Cultural manager26%
  6. 239Screenwriter26%