Automation index
How much of a Shelf replenisher’s job can AI already do?
A wave comes earlier. Filling the shelf without blocking the aisle do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shelf replenisher
21%
AI can already do 21% of this job.
#444 / 643
View rankingShelf replenisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wave, location and the cage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shelf, date and the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Aisle, the customer and not blocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Out of stock, calling it and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, overtime and not mixing batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shelf full, and aisle clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waves
- the shelf
- dates
- aisles
- stock-outs
- cages
- batches
- gaps
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334
IS WORK OVER?
Drafter
26%
#202 / 643
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118