Automation index
How much of a Shelf replenisher’s job can AI already do?
A wave comes earlier. Filling the shelf without blocking the aisle do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shelf replenisher
21%
AI can already do 21% of this job.
#435 / 633
View rankingShelf replenisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wave, location and the cage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shelf, date and the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Aisle, the customer and not blocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Out of stock, calling it and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, overtime and not mixing batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shelf full, and aisle clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waves
- the shelf
- dates
- aisles
- stock-outs
- cages
- batches
- gaps
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334
IS WORK OVER?
Excavator operator
18%
#574 / 633
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342