Automation index
How much of a Shelf replenisher’s job can AI already do?
A wave comes earlier. Filling the shelf without blocking the aisle do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shelf replenisher
21%
AI can already do 21% of this job.
#530 / 753
View rankingShelf replenisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wave, location and the cage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shelf, date and the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Aisle, the customer and not blocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Out of stock, calling it and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, overtime and not mixing batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shelf full, and aisle clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waves
- the shelf
- dates
- aisles
- stock-outs
- cages
- batches
- gaps
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165