Automation index
How much of a Shelf replenisher’s job can AI already do?
A wave comes earlier. Filling the shelf without blocking the aisle do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shelf replenisher
21%
AI can already do 21% of this job.
#514 / 733
View rankingShelf replenisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wave, location and the cage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shelf, date and the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Aisle, the customer and not blocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Out of stock, calling it and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, overtime and not mixing batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shelf full, and aisle clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waves
- the shelf
- dates
- aisles
- stock-outs
- cages
- batches
- gaps
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142