Automation index
How much of a Shelf replenisher’s job can AI already do?
A wave comes earlier. Filling the shelf without blocking the aisle do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shelf replenisher
21%
AI can already do 21% of this job.
#523 / 743
View rankingShelf replenisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wave, location and the cage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shelf, date and the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Aisle, the customer and not blocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Out of stock, calling it and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, overtime and not mixing batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shelf full, and aisle clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waves
- the shelf
- dates
- aisles
- stock-outs
- cages
- batches
- gaps
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334
IS WORK OVER?
Power engineer
22%
#395 / 743
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151