Automation index
How much of a Shellfish gatherer’s job can AI already do?
A tide sheet comes earlier. Taking the quota without emptying the bed do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shellfish gatherer
18%
AI can already do 18% of this job.
#680 / 743
View rankingShellfish gatherer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tide, quota and the day’s permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Bed, rake and the cold in the legs.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Grade, size and what goes back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, the price and the one who does not declare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The toxin, the closure and not going out anyway.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The quota, and not emptying the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tide
- quotas
- shellfish beds
- minimum sizes
- the market
- biotoxins
- the rake
- gathering permits
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142