Automation index
How much of a Shellfish gatherer’s job can AI already do?
A tide sheet comes earlier. Taking the quota without emptying the bed do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Shellfish gatherer
18%
AI can already do 18% of this job.
#580 / 643
View rankingShellfish gatherer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tide, quota and the day’s permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Bed, rake and the cold in the legs.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Grade, size and what goes back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, the price and the one who does not declare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The toxin, the closure and not going out anyway.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
The quota, and not emptying the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tide
- quotas
- shellfish beds
- minimum sizes
- the market
- biotoxins
- the rake
- gathering permits
Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221
IS WORK OVER?
Civil engineer
25%
#236 / 643
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142