IS WORK OVER?

Automation index

How much of a Shellfish gatherer’s job can AI already do?

A tide sheet comes earlier. Taking the quota without emptying the bed do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Shellfish gatherer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tide, quota and the day’s permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Bed, rake and the cold in the legs.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Grade, size and what goes back.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Market, the price and the one who does not declare.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The toxin, the closure and not going out anyway.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
The quota, and not emptying the bed.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tide
  • quotas
  • shellfish beds
  • minimum sizes
  • the market
  • biotoxins
  • the rake
  • gathering permits

Sources for this job· O*NET 45-3011.00· ESCO/ISCO 6221

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 567Gas fitter18%
  2. 568Gardener18%
  3. 569Train driver18%
  4. 571Stonemason18%
  5. 572Port crane operator18%
  6. 573Tower crane operator18%